MIL-DTL-25866C
6.2 Acquisition requirements. Acquisition documents should specify the following:
a.
Title, number, and date of specification.
b.
When first article testing is required (see 3.1).
c.
When batteries are required (see 3.14).
d.
Packaging requirements (see 5.1).
6.3 First article tests. Three lights will be required as first article samples to be subjected
to the requirements of this specification. The point of inspection for these tests will be specified.
6.4 Subject term (key word) listing.
Switch, inertia
6.5 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business