MIL-DTL-4510F
6.2 Acquisition requirements. Acquisition documents should specify the following:
a.
Title, number, and date of this specification.
b.
Type, class and size required (see 1.2).
When first article inspection is required (see 3.1).
c.
Whether environmental inspections are not required (see 4.3.3).
d.
e.
Packaging requirements (see 5.1).
6.3 Subject term (key word) listing.
Bulb
Control arm
Housing, lamp
Lamp, sealed beam
Metals, dissimilar
Seal, roof
Solder
Soldering
6.4 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
Custodian:
Preparing Activity:
Air Force - 99
DLA - GS2
(Project 6220-2009-001)
Review Activity:
Air Force - 71
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency
of the information above using the ASSIST database at https://assist.daps.dla.mil/.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business